Download Solution PDFCharged establishment is the amount of expenditure incurred on
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFExplanation:
Contingencies:
- It is an amount of money set aside to cover any unexpected costs that can arise throughout a construction project.
- This money is on reserve and is not allocated to any specific area of work.
For making any estimate workable, additional expenses are to be added.
The followings are the additional expenses that are to be considered during estimates:
- Extra Expenses (contingencies) – 3 to 5%
- Contract work establishments – 1.5 to 2%
- Tools and Machinery – 1 to 1.5%
- Contractor’s profit – 10%
- Departmental Profit – 10 to 15%
Work charged establishment cost
- Work charged establishment charges include temporary establishments as are employed for the execution of the intermediate technical supervision or departmental stores and machinery in connection with a specific work.
- For such work-charged establishment, an amount of 2% to 2.5% is sanctioned.
Last updated on Jun 4, 2025
-> OSSC JE Preliminary Fiinal Answer Key 2025 has been released. Applicants can raise objections in OSSC JE answer key till 06 June 2025.
-> OSSC JE prelim Exam 2025 was held on 18th May 2025.(Advt. No. 1233/OSSC ).
-> The OSSC JE 2024 Notification was released for 759 vacancies through OSSC CTSRE 2024.
-> The selection is based on the written test. This is an excellent opportunity for candidates who want to get a job in the Engineering sector in the state of Odisha.
-> Candidates must refer to the OSSC JE Previous Year Papers to understand the type of questions in the examination.