Raju finishes  part of a work in 1 hour. How much part of the work will be finished in  hours?

This question was previously asked in
Bihar STET Paper I: Mathematics (Held In 2019 - Shift 1)
View all Bihar STET Papers >

Answer (Detailed Solution Below)

Option 3 :
Free
Bihar STET Paper 1 Social Science Full Test 1
150 Qs. 150 Marks 150 Mins

Detailed Solution

Download Solution PDF

Given: 

Raju's work rate:  part of the work per 1 hour

Time: 2 hours

Concept used:

Work done = Work rate × Time

Calculation:

Work done = × 2 

To multiply fractions, you multiply their numerators together and their denominators together:

Work done =  × 

Work done = 

∴ Raju will finish  part of the work in 2  hours.

Latest Bihar STET Updates

Last updated on Jul 3, 2025

-> The Bihar STET 2025 Notification will be released soon.

->  The written exam will consist of  Paper-I and Paper-II  of 150 marks each. 

-> The candidates should go through the Bihar STET selection process to have an idea of the selection procedure in detail.

-> For revision and practice for the exam, solve Bihar STET Previous Year Papers.

Hot Links: teen patti real cash game teen patti tiger teen patti boss all teen patti