The purpose of scheduling in Production Planning and Control is to:

This question was previously asked in
RRB JE CBT 2 (Mechanical Engineering) ReExam Official Paper (Held On: 04 Jun, 2025)
View all RRB JE Papers >
  1. design new product layouts
  2. determine the cost of materials
  3. hire new personnel
  4. ensure products are completed on time 

Answer (Detailed Solution Below)

Option 4 : ensure products are completed on time 
Free
General Science for All Railway Exams Mock Test
2.2 Lakh Users
20 Questions 20 Marks 15 Mins

Detailed Solution

Download Solution PDF

Explanation:

Scheduling in Production Planning and Control

  • Scheduling is a critical component of Production Planning and Control (PPC) that ensures the efficient and effective use of resources, time, and materials to achieve production goals. The primary purpose of scheduling is to plan and allocate resources in such a way that production processes are streamlined, and products are completed on time. This involves assigning tasks, sequencing operations, and determining start and end times for various activities within the production cycle. Proper scheduling is essential for maintaining a smooth production flow, minimizing delays, and meeting customer demands.

Core purpose of scheduling:

1. Timely Delivery: Scheduling helps in planning the production activities in a way that products are manufactured and delivered to customers on time. This is crucial for maintaining a good reputation and building trust with customers. Late deliveries can lead to customer dissatisfaction, loss of business, and damage to the company’s reputation.

2. Resource Optimization: Scheduling ensures the efficient use of resources, including manpower, machinery, and materials. By allocating resources appropriately and avoiding overloading or underutilization, scheduling helps in maximizing productivity and reducing operational costs.

3. Reduction in Idle Time: Proper scheduling minimizes idle time for machines and workers by ensuring that tasks are sequenced logically and efficiently. This reduces downtime and enhances the overall efficiency of the production process.

4. Inventory Management: Scheduling plays a vital role in inventory management by ensuring that raw materials and components are available when needed. This helps in avoiding overstocking or stockouts, leading to cost savings and uninterrupted production.

5. Meeting Customer Demands: By ensuring that products are completed on time, scheduling helps in meeting customer demands and expectations. This is particularly important in industries where timely delivery is a critical factor in customer satisfaction.

6. Enhanced Coordination: Scheduling facilitates better coordination among different departments, such as production, procurement, and logistics. This ensures that all activities are aligned and contribute to the timely completion of products.

7. Flexibility and Adaptability: A well-designed scheduling system allows for flexibility and adaptability in case of unforeseen circumstances, such as machine breakdowns or changes in customer orders. This helps in minimizing disruptions and maintaining production schedules.

Latest RRB JE Updates

Last updated on Jul 21, 2025

-> The RRB JE CBT 2 Result 2025 has been released on July 21, 2025 for all RRBs Zones (Ahmedabad, Bengaluru, Jammu-Srinagar, Kolkata, Malda, Mumbai, Ranchi, Secunderabad, and Thiruvananthapuram).

-> RRB JE CBT 2 Scorecard 2025 has been released along with cut off Marks.

-> RRB JE CBT 2 answer key 2025 for June 4 exam has been released at the official website.

-> Check Your Marks via RRB JE CBT 2 Rank Calculator 2025

-> RRB JE CBT 2 admit card 2025 has been released. 

-> RRB JE CBT 2 city intimation slip 2025 for June 4 exam has been released at the official website.

-> RRB JE CBT 2 Cancelled Shift Exam 2025 will be conducted on June 4, 2025 in offline mode. 

-> RRB JE CBT 2 Exam Analysis 2025 is Out, Candidates analysis their exam according to Shift 1 and 2 Questions and Answers.

-> The RRB JE Notification 2024 was released for 7951 vacancies for various posts of Junior Engineer, Depot Material Superintendent, Chemical & Metallurgical Assistant, Chemical Supervisor (Research) and Metallurgical Supervisor (Research). 

-> The selection process includes CBT 1, CBT 2, and Document Verification & Medical Test.

-> The candidates who will be selected will get an approximate salary range between Rs. 13,500 to Rs. 38,425.

-> Attempt RRB JE Free Current Affairs Mock Test here

-> Enhance your preparation with the RRB JE Previous Year Papers

Get Free Access Now
Hot Links: teen patti real cash 2024 teen patti plus teen patti noble