നേടുക Industrial Engineering ഉത്തരങ്ങളും വിശദമായ പരിഹാരങ്ങളുമുള്ള മൾട്ടിപ്പിൾ ചോയ്സ് ചോദ്യങ്ങൾ (MCQ ക്വിസ്). ഇവ സൗജന്യമായി ഡൗൺലോഡ് ചെയ്യുക Industrial Engineering MCQ ക്വിസ് പിഡിഎഫ്, ബാങ്കിംഗ്, എസ്എസ്‌സി, റെയിൽവേ, യുപിഎസ്‌സി, സ്റ്റേറ്റ് പിഎസ്‌സി തുടങ്ങിയ നിങ്ങളുടെ വരാനിരിക്കുന്ന പരീക്ഷകൾക്കായി തയ്യാറെടുക്കുക

Latest Industrial Engineering MCQ Objective Questions

Top Industrial Engineering MCQ Objective Questions

Industrial Engineering Question 1:

Break even analysis consist of

  1. Fixed expenses
  2. Variable cost
  3. Sales revenue
  4. All of these

Answer (Detailed Solution Below)

Option 4 : All of these

Industrial Engineering Question 1 Detailed Solution

Breakeven analysis is used to find the minimum level of production required. It evaluates both fixed and variable costs.

A breakeven analysis is used to determine how much sales volume your business needs to start making a profit, based on your fixed costs, variable costs, and selling price.

Break-even point usually means the business volume that balances total costs with total gains. At break-even volume, in other words, total cash inflows equal total cash outflows. At Break-Even, in other words, net cash flow equals zero.

Break even analysis consists of:

  1. Fixed cost
  2. Variable cost
  3. Sales revenue

Industrial Engineering Question 2:

The headquarters of the Eastern Railway Zone is located at _______. 

  1. Kolkata  
  2. Bhubaneswar  
  3. Patna  
  4. Durgapur

Answer (Detailed Solution Below)

Option 1 : Kolkata  

Industrial Engineering Question 2 Detailed Solution

The correct answer is Kolkata.

Key Points

  • Indian Railways is divided into 18 zones and 73 divisions.
  • Divisional Railway Manager (DRM) heads the division and he/she reports to General Manager (GM).
  • Railway Division is the smallest administrative unit of Railways.
  • North Zone is the largest zone.

Given below is the list of all railway zones and their headquarters:

Railway Zone

Headquarters

Central Railway

Mumbai

Northern Railway

Delhi

North Eastern Railway

Gorakhpur

Northeast Frontier Railway

Guwahati

Eastern Railway

Kolkata

South Eastern Railway

Kolkata

South Central Railway

Secunderabad

Southern Railway

Chennai

Western Railway

Mumbai

South Western Railway

Hubballi

North Western Railway

Jaipur

West Central Railway

Jabalpur

North Central Railway

Allahabad

South East Central Railway

Bilaspur

East Coast Railway

Bhubaneswar

East Central Railway

Hajipur

Metro Railway

Kolkata

South Coast Railway

Visakhapatnam

Industrial Engineering Question 3:

The amount of time by which an activity can be delayed without affecting project completion time is

  1. Free float
  2. Total float 
  3. Independent float
  4. Activity float

Answer (Detailed Solution Below)

Option 2 : Total float 

Industrial Engineering Question 3 Detailed Solution

Explanation

Slack or Event Float

  • Slack corresponds to the event in PERT.
  • Float corresponds to activity in CPM.

Slack

  • It is defined as the amount of time by which an event can be delayed without delaying the project schedule.
  • Slack of an event = Latest Start Time – Earliest Start Time OR Latest Finish Time – Earliest Finish Time

There are three types of floats.

Total Float (TF)

  • It is the amount of time by which an activity can be delayed without delaying the project duration.
  • Extra time available for an activity without delaying the project schedule.
  • If the value of TF is,
    • Positive – Recourses are surplus and can be allocated for other activities.
    • Zero – Resources are just sufficient to complete the activity on time.
    • Negative – Resources are not sufficient and activity may not complete 
  • Total Float = Latest start time – Earliest start time

Free Float (FF)

·         Part of the Total Float, which can be used without affecting the float of succeeding activity.

·         Extra time by which an activity can be delayed so that the succeeding activity can be started on earliest start time.

  • Free float = Total Float – Head event slack

Independent Float

(IF)

  • It is amount of free float time which can be used without affecting either the head or the tail event.
  • Independent float = free Float – Tail event slack

Industrial Engineering Question 4:

Pre-planning stage in production planning and control includes which of the following activities?

  1. Inventory control 
  2. Quality control
  3. Demand forecasting
  4. Dispatching

Answer (Detailed Solution Below)

Option 3 : Demand forecasting

Industrial Engineering Question 4 Detailed Solution

Explanation:

Production Planning & Control consist of three different stages.

  1. Planning
  2. Action
  3. Monitoring.

Planning Stage: Planning stages include activities such as planning the resources, facilities, etc. They are further divided into two stages.

  • Pre-planning Stage: This stage deals with the activities such as product planning, forecasting of the demand on the basis of the past trend, inputs planning, plant and facility planning related to location and layout.
  • Planning Stage: After the pre-planning, the quantity, level of quantity, process capacity, production planning like routing, scheduling materials, tools planning, etc. are carried out in the planning stage.

Action Stage: It is the real implementation of the plan. It begins with dispatching functions, which deals with the progress of work or job.

Monitoring: In this stage, the planned activities are controlled and monitored by using various techniques such as inventory control, tool control, cost control, quality control, etc. 

Industrial Engineering Question 5:

The original cost of equipment is rupees 1,00,000. Its salvage value at the end of its useful life of five years is 40,000. Its book value at the end of two years of its useful life as per straight line method of evaluation of depreciation will be

  1. 68000
  2. 76000
  3. 58000
  4. 940000

Answer (Detailed Solution Below)

Option 2 : 76000

Industrial Engineering Question 5 Detailed Solution

Concept

By Straight line method 

Depreciation is given by 

\({D_m} = \frac{{{C_i} - {C_s}}}{n}\)

Where Dm is depreciation 

Ci is Initial cost of an asset

Cs is Salvage or scrap value (Estimated at the end of utility period)

Book value (Bm) at the end of 'm ' years life is given by 

\({B_m} = {C_i} - m × {D_m}\)

Calculation

Given,

Ci = 1,00,000 /-, Cs = 40,000 /- 

n = 5 years

Depreciation is 

\({D_m} = \frac{{1,00,000 - 40000}}{5} = 12,000\)

Book value at the end of 2 years of lifetime is given by

\({B_m} = {C_i} - m × {D_m}\)

= 1,00,000 - 2 × 12,000 = 76,000 /-

Industrial Engineering Question 6:

Fixed quantity systems are also termed as ______ systems of inventory control. 

  1. q
  2. p
  3. qv
  4. pq

Answer (Detailed Solution Below)

Option 1 : q

Industrial Engineering Question 6 Detailed Solution

Explanation:

In inventory management system there are two ways to review the inventory, they are

Fixed order or quantity system:

  • In this system the reorder level of the inventory is fixed as soon as the inventory reaches the reorder level a prescribed quantity is ordered in this system the size of order is fixed while the time of order is variableIt is also called reorder level system or two-bin system or Q-system.

Periodic review system/periodic inventory system:

  • In this system the period of time after which inventory is reviewed is fixed, after that particular period new order is placed at that point. In this system the time of order is fixed but the size of order is variable. It is also called fixed period system or P-system.

Industrial Engineering Question 7:

Consider the Linear Programming problem:

Maximize: 7X1 + 6X2 + 4X3

subject to:

X1 + X2 + X3 ≤ 5;

2X1 + X2 + 3X≤ 10,

X1, X2, X3 ≥ 0 (Solve by algebraic method).

The number of basic solutions is:

  1. 10
  2. 7
  3. 9
  4. 8

Answer (Detailed Solution Below)

Option 1 : 10

Industrial Engineering Question 7 Detailed Solution

Concept:

For a system of equation, the number of possible basic solution is calculated by - \({n_C}_m\)

n = number of variables.

m = number of equations.

Inequalities must be converted into equalities.

Calculation:

Given:

X1 + X+ X3 ≤ 5

X1 + X2 + X3 + S1 + 0S2 = 5     (1)

2X1 + X2 + 3X≤ 10

2X1 + X2 + 3X3 + 0S1 + S2 = 10      (2)

n = number of variables = 5

m = number of equations = 2

∴ number of basic solution = \({n_C}_m ⇒ {5_C}_2\)

∴ \(\frac{5!}{2!\;\times\;(5-2)!}\Rightarrow10\)

Industrial Engineering Question 8:

For ship vessel industry the following layout is best suited

  1. Process layout
  2. Product layout
  3. Fixed position layout
  4. Plant layout

Answer (Detailed Solution Below)

Option 3 : Fixed position layout

Industrial Engineering Question 8 Detailed Solution

Explanation:

Layout planning in manufacturing and service organisations involves the physical arrangement of various resources available in the system to improve the performance of the operating system, thereby providing better customer services.

Layouts can be classified into the following four categories:

  1. Process layout
  2. Product layout
  3. Group layout (Combination layout)
  4. Fixed-position layout

Fixed-position layout:

In a fixed position layout, the service is performed around a customer that remains stationary while the work is being done.

F1 S.S. N.J 16.08.2019 D1

For example, surgery is performed on a patient, where a patient remains stationary in operation theatre. Different doctors or specialist perform different activities in a sequence on a stationary patient.

Example: Manufacturers of aeroplanes, ships, locomotives, large turbines, heavy machinery, pressure vessels and others which involve heavy materials and sub-assemblies.

This type of layout is suitable:

  • When one or a few pieces of an identical product are to be manufactured
  • When the assembly consists of a large number of heavy parts, the cost of transportation of which is very high

 

Product Layout: In product layout, the workstations are located according to the processing sequence for the service.

Process Layout: In process layout, similar activities are grouped together according to the process or function they perform.

Industrial Engineering Question 9:

Which of the following is referred to as MRP II?

  1. Materials Requirement Planning
  2. Materials Resources Policy
  3. Manufacturing Resources Planning
  4. Maximum Retail Price

Answer (Detailed Solution Below)

Option 3 : Manufacturing Resources Planning

Industrial Engineering Question 9 Detailed Solution

Explanation:-

MRP II

  • Manufacturing Resources Planning (MRP II) is defined as a method for the effective planning of all resources of a manufacturing company.
  • MRP II Serves as an extension of MRP

Additional Information

Materials Requirement Planning, It is a planning technic that converts the master production schedule of end products into a detailed schedule for raw materials and parts used in those end products.

Maximum retail price is the highest price labeled on the product which can be charged by the seller of that product.

ERP - Enterprise Resource Planning

F1 Krupalu Madhu 29.09.20 D4

Industrial Engineering Question 10:

Which of the following is NOT the part of 6M’s of Six Sigma? 

  1.  Motion
  2.  Materials
  3.  Machine
  4.  Man 

Answer (Detailed Solution Below)

Option 1 :  Motion

Industrial Engineering Question 10 Detailed Solution

Explanation:

Six-sigma:

  • Six-sigma is an business statistical strategy.
  • It is used to identify defects, and removing them from the process of products to improve quality.
  • Bill Smith, "Father of six-sigma" introduces this quality improvement methodology to Motorola.


6M's of six-sigma:

Process variation in six-sigma is defined in terms of 6M's i.e. 6 elements contribute to variation in a process. They are:

  • Method
  • Man
  • Machines
  • Materials
  • Measurement
  • Mother nature